Chain Locker and Forepeak.













Floors and bulkheads have been cut and fitted and are ready for final fixing, once sealing of timber in the forepeak and chain locker has been done. Also before final fitting is done the galvanic protection cable to the bow fitting needs to be inserted as well as the chain locker drainage to the sump. The pictures show the floors of the chain locker and forepeak cubby temporary in place as well as the chain locker bulkhead which has been cut but still needs the hatch to be cut out and finished.